Structural Renovations have recently completed waterproofing works at the Port of Tilbury on the site of the Tilbury Green Power Project.

Powered by waste wood material, such as that from construction sites, the facility is expected to generate 300 Gwh of green electricity per year – enough to power more than 80,000 homes.

Structural Renovations were employed to apply Flexcrete waterproof materials within the storage pit of the wood chip storage building. Flexcrete Cemtitious Coating 851 has been applied to the junction of the concrete slab and walls to prevent future water ingress to ensure the stored materials remain dry.

 