Structural Renovations have recently completed masonry repair works at the West Reservoir Centre in Stoke Newington, North London.

Fractures had developed adjacent to the large openings of the main tower building. A specification was developed to reintroduce the structural integrity at these locations using a combination of Helifix HeliBars, CemTies and CrackBond TE.

The building remained in operation throughout and the scaffold was specifically designed and installed so that none of the scaffolding was at ground floor level. Instead the scaffold was erected from the existing steel beams.